KUALA LUMPUR: Phase two of the sheet piling work in the drain area near the landslide location at Jalan Wawasan 3/9 Taman Wawasan in Puchong is now 50% complete.
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114