KLUANG: An initial allocation of RM30mil is needed to repair damaged roads and collapsed slopes caused by the floods in Johor, says Datuk Seri Ahmad Maslan.
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114