GEORGE TOWN: Work to connect the two 600mm pipes across Sungai Perai to replace the leaking pipeline at the bottom of the river was completed early Wednesday (Jan 31).
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114