PETALING JAYA: Toll rates for 11 highways have been restructured to flat rates until the end of their respective concession period, says the Works Ministry.
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114