KUALA LUMPUR: The opening of the five-kilometre Tun Razak Exchange (TRX) underground tunnel on Nov 29 is expected to reduce traffic into the city by 30%, said Works Minister Datuk Seri Alexander Nanta Linggi.
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114