KUANTAN: An immediate approval for RM1.5mil was made by the government for the repair of the Kuantan-Chukai Road (FT03), Section 358.0-359.0, which was damaged due to frequent floods and use by overloaded heavy vehicles.
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114