CYBERJAYA: Over 100 transmission stations were disrupted due to the floods as of 10am on Wednesday (Dec 27), 24 of which are now operational, says the Malaysian Communications and Multimedia Commission (MCMC).
Original article here
ultimate-member
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/antsomi-news/htdocs/news.antsomi.com/wp-includes/functions.php on line 6114